.png)
This new 50,000 square-foot development was designed and built to replace Lineage’s blast freezing operation in Calgary.
.png)
A CFIA-compliant facility delivered through an integrated Plan–Design–Build approach.

A turnkey plan, design, and build project for a 18,000 square foot CFIA ready production and cold storage facility, this successful project was delivered for a manufacturer of freezer-to-oven filled pastries.

Coldbox designed and built Papa John’s first dough production and distribution facility in 2016 in Canada.

As a leading importer, wholesaler, and distributor of Asian food products in North America, Wismettac Group found itself in an extremely competitive real-estate market when needed to expand.

At a moment of growth, GoCold Solutions required additional space within their existing site to accommodate customer needs.

Temperature controlled supply chain company exclusively focused on temperature-sensitive product logistics; Lineage needed to expand quickly.

The newest Costco warehouse in this growing south London neighborhood was completed on an aggressive timeline.

Delivered on a four acre site, this environmentally controlled storage facility includes a fire-rated freezer, cold dock, and office space.
.png)
A CFIA-compliant facility delivered through an integrated Plan–Design–Build approach.

Delivered on a four acre site, this environmentally controlled storage facility includes a fire-rated freezer, cold dock, and office space.

Built for a leading North American specialty food distributor, the Chefs Warehouse project included the construction of a freezer, coolers, process and production areas, test kitchen and office space.

The newest Costco warehouse in this growing south London neighborhood was completed on an aggressive timeline.

At a moment of growth, GoCold Solutions required additional space within their existing site to accommodate customer needs.

Temperature controlled supply chain company exclusively focused on temperature-sensitive product logistics; Lineage needed to expand quickly.
.png)
This new 50,000 square-foot development was designed and built to replace Lineage’s blast freezing operation in Calgary.

Coldbox designed and built Papa John’s first dough production and distribution facility in 2016 in Canada.

A turnkey plan, design, and build project for a new Quality Fast Foods facility, As part of the Premium Brands family.